Giving Every Shift the Full Picture
4 Weeks
trial from 29 Jun 2026
Full afternoon shift
& admins using it
Integration request
from Reliability Manager
~50% Quicker Reporting
per the Shift Leader
Handovers Nobody Recorded
Ingham's ran breakdowns and repairs through Maximo, but entering them was slow and awkward, so it often didn't happen.
Handovers happened out loud, not in Maximo
Asked how they worked before Workex, the Shift Leader said: "You didn't record it." Nobody checked Maximo at handover, or went back to it when something went wrong, because it was too hard to use.
Nobody knew where the job was up to
"You're scratching your head wondering where they're up to. You're only guessing."
The system was in the wrong place
The computer is in the workshop, not at the machine. "Generally, there are no photos."

How Workex got in the door
Nobody pitched it. An employee spotted Workex on the number plate of Ian's car and asked what it was. Word travelled from there, and four people, including Adam, the Engineering Manager, had asked about it before Ian had given a demo.
Take Photos
Take photos like you always do, documenting the job as you go.
Add Context
Notes, location and equipment captured in seconds.
Generate the report
Has it helped you understand a job faster?
Do photos make the problem easier to understand?
How were breakdowns, repairs and handovers recorded before Workex?
Does making reporting easier mean you record more?
Has it improved shift handovers and communication?
Could the information help reduce future downtime?
Is it worth paying for?
Have you used information another tradesperson captured?
Has Workex saved you time?
What would happen if Workex was removed tomorrow?
Experienced Trades Adopt Tools That Respect Their Time
The common assumption is that experienced tradespeople resist new technology. At Ingham's, a long-serving fitter with 14 years on site called Workex "easily" 50% quicker. They didn't need convincing, because it took fewer steps than what they had.
Parts, ready before the shutdown
A photo of the sprocket, with its number and size, meant the right part was waiting when the machine went down.
Repeat faults solved faster
Past fixes are on record, so the same fault doesn't start from scratch.
Fix it before it breaks
Seeing the gap between breakdowns turns reactive maintenance into preventative.
Proven on the Floor
The Reliability Manager, who didn't want another system to check, asked for an IBM Maximo integration. Workex was easy enough for the floor to use, and Maximo is still where the records need to end up, so the next step was getting one to feed the other.
Adoption came from the workforce, not a mandate.
Experienced trades embraced it without being pushed.
Vendor sign-off sits with site IT, so our Data & Security Policy is public.
On hold pending Ingham's IT review
Get the Full Ingham's Case Study
The full flows, the design detail and how a four-week trial turned into a conversation about a longer-term partnership.